0%
A newly fitted commercial kitchen line, photographed on the day of handover

Installation

New equipment, fitted properly, commissioned on the day and documented before we leave.

Supply
Fit
Commission
How

Most equipment that fails early was fitted badly, not built badly.

Extraction that was never balanced. Refrigeration sited next to a fryer. A three-phase supply that was fine on paper and marginal in practice. None of it shows on the day of handover. All of it shows in year two.

So we do the dull parts properly: loads calculated, clearances measured, airflow balanced and written down, and every certificate issued before handover rather than chased for months afterwards.

The equipment is only half of an installation. The other half is whether the building can actually run it.

SUPPLY
FIT
COMMISSION

we fit

SURVEY FIRST

Before anything is ordered

Loads, clearances and services measured before a single order is placed — because the showroom does not know your building.

A.Barrel

Open worked to control visually the mainspring. Equipped with slipping bridle to avoid excessive tension.

B.Geartrain

Optimized transmission of torque from the barrel to the tourbillon. Enhanced accuracy.

C.Setting System

Improved smooth winding and time-setting.

Flying Tourbillon

Mesmerizing by the Minute

A captivating sophistication of horological kinematics. 60-second rotating cage.

Double-wishbone System

A technical tour de force.

Scaling down the double-wishbone system requires exceptional engineering expertise and precision. Arms in Titanium Grade 5.

Fitted to the building

Measured, not assumed

Services traced, loads checked and clearances measured against the manufacturer’s figures rather than the showroom’s.

Sapphire caseback
Available as an option.
Baseplate

The rigidity prevents distortion in the event of impact or other shocks.

Commissioned on site

Signed off, not switched on

Airflow balanced, temperatures verified, gas and electrical tested and signed off. Every number goes into the handover file.

D.Case

The case embodies a seamless fusion of form and function, embracing the principles of minimalism while incorporating futuristic elements.

E.Ergonomics

Perfectly sized and curved. Water Resistance 3 ATM. Bead blasted to enhance its softness and unique grey colour.

Time, Set in Stone

Holistic approach involving materials selection and ergonomic considerations.

Handover

What you are left with

Everything the next engineer will need, in one file.

10.74 G
Case
11.026 G
Calibre
8.95 G
Caseback
Time, Set in Stone

Holistic approach involving materials selection and ergonomic considerations.

32.516 G
Total
ItemMaterial
QualityWeight
  • Equipment schedulePDF
    Complete10.74
  • Commissioning sheetPDF
    Signed1.8
  • Gas certificatePDF
    Where required8.95
  • Electrical testPDF
    Signed1.891
  • Airflow readingsPDF
    Recorded0.192
  • Temperature logPDF
    Baseline0.351
  • Manufacturer manualsPDF
    Original0.105
  • Warranty registrationEmail
    Confirmed0.15
  • Parts listPDF
    With codes0.5233
  • PhotographsJPG
    Before & after0.085
  • Site drawingsPDF
    As fitted6.39
  • Service schedulePDF
    Recommended4.636
Crown

Training

The staff, not only the manager

We do not leave until the people who use it every day can run it, clean it, and know which noise means stop.

Fitted from Winterthur

The team that installs your equipment is the team that comes back to service it. Nothing is handed to a subcontractor you have never met and cannot call.

By the people who maintain it

From survey to commissioning, the same names on the job sheet.

2018
The survey

We measure the space, trace the services and check what the building can actually carry before anything is ordered.

2019
Drawings, agreed before a single hole is drilled.

2020
Supply and delivery

Equipment ordered against the survey and delivered to a date that suits the site rather than the supplier.

2021
Fitted, levelled, sealed and connected.

2022
Commissioning and certification

Airflow balanced, temperatures verified, gas and electrical tested and certified. Readings recorded rather than remembered.

2023
Training and handover

2024
First service visit

Specs

Every installation ends with the same set of documents, whatever the size of the job.

Survey
  • MaterialRecorded
baseplate
Drawings
  • MaterialAgreed
double-wishbones
Delivery
  • MaterialScheduled
bridge-gt
Fitting
  • MaterialLevelled
Fitting stage of an installation
Commissioning
  • MaterialSigned
bridge-hours-minute
Certificates
  • MaterialIssued
barillet
Training
  • MaterialDelivered
case-front
Warranty
  • MaterialRegistered
case-frame
Service plan
  • MaterialBooked
back-plate

Get a quote

Currently taking bookings

Priced from a survey, not from a phone call.

Options
Line drawing of a pallet truck
Supply & Fit
Line drawing of a pallet truck
Turnkey
Line drawing of a pallet truck
Design & Build

How a fit-out runs

1
Survey
& drawings

We come and measure. You get drawings and an equipment schedule before you are asked for anything.

2
Quote
& dates

A fixed price against that schedule, with installation dates that fit around your trading rather than ours.

3
Fit
& handover

Fitted, commissioned, certified and handed over with every document in one file.

Sending this does not book anything. We reply with a price and a time, or with a question.

How a request works

Three steps, no call centre, and one email that decides everything.

1
You Send It
& A Person Reads It

Your request arrives at our office in Winterthur, where somebody actually reads it — not a queue, not an auto-responder rehearsing how much your enquiry matters to us. Tell us what has stopped working, where it is, and how badly you need it back. Photographs help far more than adjectives.

2
We Answer
& Usually Ask Something

You get one of two replies, quickly: a price with a time we can be there, or a question. The question is almost always about access, make or model — the unglamorous detail that decides whether our technician arrives with the right part or with an apology.

3
You Get The Email
& Only Then Is It Booked

Nothing is reserved until a written booking confirmation reaches you by email. Not when you send the form. Not when we reply. When that email lands. Until it does, the slot is genuinely still free — which is our polite way of saying somebody else can take it.